The Honourable Society of Lincoln's Inn, Great Hall

Jupiter was very proud to be asked to supply and install the underfloor heating in this prestigious, listed building. Installation required our IDEAL ECO system to be installed between the existing joists. An engineered timber final floor was specified to be installed on the Screed Replacement Tile system.
Architect - MICA
Main contractor - Graham
M&E - Mechanical Services Ltd
Architect - MICA
Main contractor - Graham
M&E - Mechanical Services Ltd