Lincolns Inn, Old Hall

In 2015 JUPITER were specified by Rick Mather Architects to install a new underfloor heating system over an existing floor which was originally finished with timber boards. The timber floor had shown signs of water damage which turned out to be caused by a long forgotten rusting, cast iron underfloor heating system.
JUPITER were charged with levelling the floor and rebuilding it to existing levels.
JUPITER were charged with levelling the floor and rebuilding it to existing levels.