St Bedes Church, Rotherham

St Bede's Church, Rotherham, 2012
Rather than completely excavate the floor on this project it was decided to remove the existing floor covering and replace with high compressive strength insulation and the IDEAL EPS system.
Finished floor is to be a York stone.
Rather than completely excavate the floor on this project it was decided to remove the existing floor covering and replace with high compressive strength insulation and the IDEAL EPS system.
Finished floor is to be a York stone.
Project information
Architect: John Hill Associates | Consulting Engineers: JSH Consulting | Main contractor: OP Construction Ltd